Forry T/R Sets
FORRY Transformer/Rectifier power units (formerly ABB Westinghouse) have provided reliable power for electrostatic precipitation processes since 1959.
FORRY TR's can be supplied in virtually any OEM configuration for easy fit-up to replace even obsolete TR's.
The FORRY Round-Tank TR serves as an identical direct replacement to the flagship R-C Transformers installed from the 1960's to date. All FORRY TR sets are equipped with 100% copper wound transformers and heavy-duty R/C compensated diode stacks.
Each TR set undergoes extensive quality assurance testing before shipment. Several models are available in stock for immediate shipment.
Optional Accessories & Equipment
Internal Voltage Divider Resistor(s), Typically 80 Megohms, for Feedback to Automatic Voltage Control.
- External Voltage Metering Resistor
- External Current Metering Resistor
- Low Voltage Taps for Varying the Primary Input Voltage
- Vacuum-Pressure Gauge
- Alarm Contacts for:
- Thermometer,
- Liquid Level Gauge,
- Vacuum Pressure
- Non-Standard Ambient (Standard=40°C avg/50°C max)
- Altitude Above 3,300 Feet
- Premium Epoxy Paint System for Corrosive Environments (Passed 5,000 Hour Salt Spray Test)
- Special Paint Colors (ANSI 70, Light Gray, Std)
- Current Limiting Reactor Available with:
- No Enclosures (Open Core & Coil assembly)
- NEMA 3R Enclosure
- T/R LV Bushing Enclosure
- Custom Retrofit Designs for Replacement of Existing T/R Sets
Electrical Tests
The following electrical tests are conducted on FORRY T/R Sets:
- Resistance
- LV Winding
- HV Winding
- Choke Coil
- Transformer Voltage Ratio
- No-Load and Impedance
- Diode Stack Forward and Reverse Meggar
- Diode Forward and Reverse Meggar Readings: Repeated to Assure Rectifier was Not Damaged During the Insulation Test
- Resistor Test
- Induced Potential and Spark Test
- Sparkover Test
- Induced Potential Test
- Applied Potential Test
- Grounding Switch Resistance Test
Leak Test
Completed unit is pressure tested at 8 psig for 6 hours. In addition, the tank is subjected to a full vacuum during the core/coil processing and filling operation
© 2007-2012 Stock - Schenck Process Group
